BESS

Sinexcel energy storage converters

Power conversion systems (PCS) and medium-voltage stations for battery energy storage, from 30 kW modules up to 6.9 MW.

Through AiP

What you get with the equipment

  1. Grid connection check

    Measurement of load and grid power quality before installation. High-power chargers and energy storage systems require a check of the connection capacity.

  2. Sizing

    Power, configuration and connector layout based on the site, the fleet and the consumption profile.

  3. Power quality

    Chargers and converters are non-linear loads. Compensation and filtering, where needed, from the same supplier.

Need help choosing?